VEDA IN Surface treatments
With the imminent entry of autumn, we should take the necessary precautions in the execution of surface treatments.
The ban begins in a few days and the most suitable for our summer climate emulsions begin to generate low yields in the execution by the cold and the few hours of insolation that we are already living.
Asphalts specifications based emulsions remain unchanged throughout the year. If the manufacturer wants a change in specifications to continue the work, we do get an email with the desired specification.
We recall that in remitos load the batch number corresponding detailed, and which can enter our website to have the Quality report and to corroborate with the requested specifications.
To maintain the quality of the works must run less meters per day before releasing traffic with some specific recommendations always looking to reduce the amount of water in the system.
We invite you to know in detail the recommendations on the following link "SEVEN RECOMMENDATIONS FOR USE OF EMULSIONS IN WINTER"
surface treatments:
1) heating the emulsion to be used above 70 ° C to promote evaporation of water from the emulsion itself.
2) Do not wet aggregates and try to use the top in the collection that are drier and drained, not load the gathering at the bottom.
3) Start the task early in the morning, regardless of the prevailing temperature, for that tranche has executed the most hours of exposure to air, wind and sun.
4) Apply TMT technologiesThat favor locking of aggregates applied, achieving superior quality and finish.
5) Have properly calibrated equipment graveled and irrigation to the quality objective is sought to be achieved.
Irrigations primer:
In these autumn and winter periods irrigation primer they are affected by the high rate of humidity in the foundations.
It must be respected as well as primers with dilute MC 1, optimum moisture application for the purpose of achieving a successful work.
By the above, it is normal for a primer in summer takes less than 1 hour in winter takes more than 24 hours to get to be acceptable.
Soil stabilization:
It is best suited to perform soil stabilization with cement or lime period.
Water needs hydration are very basic and profiling work, compaction and sealing are unmatched.
Here the sealing emulsion IRRIGATION BITAFAL 65 at 1 per square meter lt should be complemented with a sealed with quarry dust good quality.
These bases have such successful results supporting several months before recommencing graveled tasks in appropriate months.