INAUGURATION OF WORKS IN MALDONADO
The President of the Republic, the Minister and other authorities inaugurated important works for the Department
In the Pan de Azucar Interchange, Traxpalco had to dig into the rock to lower the elevation of the Interbalnearia and be able to place a bridge on Route 37 to connect Pan de Azúcar and Piriápolis at a different level. The challenge of doing this work without explosives was one of the biggest challenges of the work that also required a rolling layer with modified asphalt. BITAFLEX AM2.
Another improvement in intersections occurred in the Route 104 and Route 10 roundabout that Serviam executed with a change in Route 104 layout and elevation of Route 10 elevation to take advantage of better visibility. In this case, the asphalt layer was made with modified asphalt. BITAFLEX AM3 that ensures a long useful life to the paving made. The installation of a sculpture by Pablo Atchugarry in the roundabout has already been announced, marking the presence of the sculptor in the area, since he has his museum at km 4 of Route 104, where the accesses were also made.








