INAUGURACION ROUTE 8 melo-Aceguá
the section built by the company CVC on Route 8 connecting Melo with the Brazilian border was opened.
On 10 September the ribbon cutting took place in the village Isidoro Noblía found in the newly renovated section. The ceremony was attended by Minister Victor Rossi, the Mayor of Cerro Largo, Pablo Duarte, representatives of the company, DNV and other national and local authorities as well as colleagues and friends.
The section was recycled in 9 m and then a road of 7.2 m was conducted in double bituminous treatment with fog. In some sites existing sewers widened and conditioned with asphalt some sections as traversing Noblía.
Recycling cement was performed in 25 cm depth giving a great bearing capacity to stretch. irrigation curing is then performed with
Recycling cement was performed in 25 cm depth giving a great bearing capacity to stretch. irrigation curing is then performed with Emulsion IRRIGATION 65 which allowed the release to traffic during last winter without problems. Bituminous simple treatment was performed on the 9 m wide while the fog twice using only road always Emulsion IRRIGATION 65 P25.
Exudation problems that appeared last year were already controlled in January and hopefully a good pavement performance this season and next summer following. The sealed surface texture was evenly across the entire width making resemblance to a asphalt.
We commend the company for having completed all the sections in very good condition and high quality. It is expected durability and enjoyment for users who can circulate in a safe and comfortable route.
Presidency note: https://www.presidencia.gub.uy/sala-de-medios/videos/ministerio+de+transporte++ruta+8++inaugura+tramo+entre+melo+y+acegua








