Road maintenance

Road maintenance

We made a tour of the fronts of works which are being used Bitafal products.

This time we made 1400 km traveled by different works in progress, or a year of operations, for the purposes of check the technical situation and being in contact with the realities of the same.
In general all routes flown are in good condition but we have to convince us that interventions on the roadways when done in a timely manner so substantially lengthen the quality and durability of our floors. On the other hand we must continue to innovate and look for continuity mechanisms that do not generate electoral cycles ups and downs in the construction industry.
1) Laying asphalt mixture with modified BITAFLEX AM3 on driveway route 5It executed by the company HYG, great work rate and tidiness, a substantial improvement on driveways executed noticeable, providing a long service life of the road.
2) Then we visited the works on route 3 Pass of the Port to Young about 6 years ago and made it in very good shape and visited the recent works carried out by the firm Gofinal / Lemiro Pietroboni in retreading executed asphalt modified asphalt BITAFLEX AM3. I became essential that retreading modified asphalt because it was the only stretch of Route 3 in the vicinity of Young was fatigued.
3) Just finished running route 25 also modified asphalt BITAFLEX AM3. We were accompanying the company Colier Opening of the section of Young to Route 90 which has a traffic of 300 trucks per day wood and general condition of the road it was very bad due to the age of the last interventions.
4) They are starting the work by signing the INCOCI route 90, Which is stabilized with portland cement and seal with a surface treatment made with highly modified emulsions.
5) On Route 30 Route 3, Diaz Alvarez signature is running treatments emulsions IRRIGATION Bitaflex 65 P40, Achieving aggregate adhesion / asphalt very good and well behaved at the high temperatures of the region.
6) We participate in the cuts ribbon inaugurating bridges all route 30, Works of very good quality and excellent execution deadlines were completed 7 months before the deadline, congratulations to the four companies that participated: Saceem, Incoci, Grinor and Cujo.
7) Bases route 30 are being prepared by the firm Tracoviax in its entirety for treatment reinforced emulsions highly modified type IRRIGATION 65 P40 as required by the standard and the respective region.
Sieve executed with bases are being stabilized very well and really congratulates them for the arduous task of mastering the basalts of the north.
8) We review the overall asphaltic treatments region surrounding the city of Artigas and we can certify that his condition is very good. We visited the section executed by Incoci on Routes 30 and 31 as well as performed by Tracoviax on Route 30 and kept in good shape, without exudates or potholes. They are very well executed with the correct dosage, presenting a texture that can be seen in the photos taken.
9) And returning, we passed the landmark CHIPING executed by Colier on route 5 in the sections of hits on Route 43, San Gregorio de Polanco. That stretch was performed for the purpose of a necessary and immediate intervention to last 1 or 2 years, as we have been 8 years and continues to provide adequate service. Only they have been some meters bridging sealing.
We have to convince us that interventions on the roadways, when done in a timely manner, so substantially lengthen the quality and durability of our floors.
That calculation is handled that for every dollar we spend on maintenance, spare 8 future dollars, in this and many other cases are checked handsomely.
We have cases of the Chiping de Ruta 8 of Serviam 4 years, the retreading 2 cm asphalt Arnel Bitaflex AM3 on route 8 which it lasted more than 10 years and only last year was milled and Recapo by the firm Techint. It is very good for our company to see the progress of the work and make returns to our friends.
Until next time.
RENOVATION OF FLORES ISLAND STREET

RENOVATION OF FLORES ISLAND STREET

The Municipality of Montevideo occasion calls Parade decided to conduct a comprehensive conditioning Flores Island street between Zelmar Michelini and Mines (NOTE COUNTRY: 26/01/2017)

For this the company Grinor S.A. He did a reprofiling of the roadway by milling, sealed with cracks and crevices Bitaflex SA 50 and he made a general bacheo for R & K Engineers then conduct a cold microsurfacing using the emulsion Bitaflex Micro 62 P25 made with hard asphalts. It is an interesting alternative to low cost recovery for urban pavements because no pavement dimensions are affected, effectively it waterproofs and retold with proper Macrotexture.

Companies were able to successfully carry out the tasks provided within tight deadlines that had indicated the administration and could perform editing 61 Parade Calling the last on 9 and 10 February with a large number of people (some 50,000 people between them days). They marched 40 troupes should be very grateful to the work carried out since a smooth, homogeneous and excellent adhesion surface was achieved!

All Pictures ON HERE

We use own and third party cookies to help us optimize your visit to our website and also to improve service delivery and thus adapt to their most relevant and useful to better their experience needs. When you click OK to continue with navigation and thus confirm that you have read the information and accept the activation of cookies.

You can allow or reject use at any time can change the Configuration Options Privacy - Cookies Policy -

Privacy settings

When you visit a website, you can store or retrieve information in your browser, mainly in the form of cookies. Check your personal services cookies here.


We track anonymous user information to improve our website.
.
  • _ga
  • _gid
  • _gat

Decline all Services
Accept all Services